Banksde Lofts
Bankside Lofts
Bankside Lofts

Murray Birrell were appointed to investigate premature deterioration of the EWIS System at Bankside Lofts, a prominent development near Tate Modern.

The EWIS System was suffering from premature ageing, severe discoloration and cracking in areas.

Overview

Murray Birrell carried out initial inspections and prepared reports. As a result, BRE were appointed to carry out a technical analysis of the rendering system as applied and it was found that a combination of variable thicknesses (between 3mm and 38mm), inappropriate substrate and poor finishing were the cause of the problems. A solution was formulated using a new Sto rendering system applied over the original combined with the repair and replacement of the substrate as required. A design and install solution was agreed to ensure 3-way warranties were in place for the design, supply and installation of the new EWIS overcoating system.

Project Details

Client

Bankside Lofts Management Ltd, represented by Currell Management.

Role

Co-ordination of investigation works. Agreeing and formulating the repair solution.

Project

Over-coating of EWIS System with new.

Site

Modern, Millennium and Gallery Buildings, Bankside Lofts, London SE1

Further details
stuart@murraybirrell.co.uk